Kitimat, British Columbia, Canada
Clough PPM
Clough as part of the Clough PPM joint venture was awarded the EPC contract for the loadout line trestle for the LNG Canada project in Kitimat, British Columbia, in the traditional territory of the Haisla Nation.
The project team will initially be based in Clough’s Calgary office for the design phase of the contract, followed by mobilisation to the Kitimat site, which will commence in due course for the construction phase.
Northern Territory Government & Paspaley Group
Darwin, Northern Territory, Australia
BAM Clough
The BAM Clough joint venture’s scope includes technical support and constructability input during Front-End Engineering Design works for the Ship Lift and Marine Industries Project in Darwin, Northern Territory.
The Ship Lift and Marine Industries project represents an AU$100 million investment by the Northern Territory Government into major projects that will boost the local economy. The proposed project will include a ship lift facility for lifting vessels from the water for dry docking and maintenance works, and a common user area, being a hardstand area, available for ship repair and maintenance works.
The project will have the capacity to lift vessels more than 90 meters in length, including the Australian Defence Forces’ new offshore patrol vessel fleet.
Clough engineers, constructs, commissions and maintains critical facilities for the Resources, Energy, and Infrastructure industries.
Confidential
Kitimat, British Columbia, Canada
Clough PPM
Clough as part of the Clough PPM joint venture was awarded the EPC contract for the loadout line trestle for the LNG Canada project in Kitimat, British Columbia, in the traditional territory of the Haisla Nation.
The project team will initially be based in Clough’s Calgary office for the design phase of the contract, followed by mobilisation to the Kitimat site, which will commence in due course for the construction phase.
Ship Lift and Marine Industries (SLAMI) FEED
Ship Lift and Marine Ind...Learn MoreShip Lift and Marine Industries (SLAMI) FEED
Learn MoreNorthern Territory Government & Paspaley Group
Darwin, Northern Territory, Australia
BAM Clough
The BAM Clough joint venture’s scope includes technical support and constructability input during Front-End Engineering Design works for the Ship Lift and Marine Industries Project in Darwin, Northern Territory.
The Ship Lift and Marine Industries project represents an AU$100 million investment by the Northern Territory Government into major projects that will boost the local economy. The proposed project will include a ship lift facility for lifting vessels from the water for dry docking and maintenance works, and a common user area, being a hardstand area, available for ship repair and maintenance works.
The project will have the capacity to lift vessels more than 90 meters in length, including the Australian Defence Forces’ new offshore patrol vessel fleet.

Sunrise Energy
Saldanha, South Africa
CMR Marine
The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.
The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.
Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.

Fortescue Metals Group
Port Hedland, Western Australia, Australia
BAM Clough
The BAM Clough Joint Venture (BAM Clough) was awarded a design and construction contract for a fifth iron ore loading berth at Anderson Point Facility (AP5) in Port Hedland, Western Australia.
The works include the design and construction of a 306 metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf conveyor modules.
JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)
Darwin, Northern Territory, Australia
BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.
The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.
Saldahna Bay LPG Import Terminal
Saldahna Bay LPG Import ...Learn MoreSaldahna Bay LPG Import Terminal
Learn More
Sunrise Energy
Saldanha, South Africa
CMR Marine
The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.
The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.
Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.
Anderson Point Facility (AP5)
Anderson Point Facility ...Learn MoreAnderson Point Facility (AP5)
Learn More
Fortescue Metals Group
Port Hedland, Western Australia, Australia
BAM Clough
The BAM Clough Joint Venture (BAM Clough) was awarded a design and construction contract for a fifth iron ore loading berth at Anderson Point Facility (AP5) in Port Hedland, Western Australia.
The works include the design and construction of a 306 metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf conveyor modules.
Ichthys LNG Product Loading Jetty
Ichthys LNG Product Load...Learn MoreIchthys LNG Product Loading Jetty
Learn MoreJKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)
Darwin, Northern Territory, Australia
BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.
The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.

Bechtel
Onslow, Western Australia, Australia
BAM Clough
BAM Clough was awarded the contract by Bechtel to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.
The scope consists of a 1.2 kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures. Design, fabrication of topside piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.
Chiyoda JGC JV
Papua New Guinea, Papua New Guinea
BAM Clough
Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.
The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

Woodside Energy Limited
Karratha, Western Australia, Australia
BAM Clough Joint Venture
BAM Clough Joint Venture was awarded the contract to construct a new LNG Jetty as part of the Pluto LNG Project for Woodside on the Burrup Peninsula near Dampier in Western Australia.
Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

Bechtel
Onslow, Western Australia, Australia
BAM Clough
BAM Clough was awarded the contract by Bechtel to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.
The scope consists of a 1.2 kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures. Design, fabrication of topside piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.
PNG LNG Project Marine Jetty
PNG LNG Project Marine J...Learn MorePNG LNG Project Marine Jetty
Learn MoreChiyoda JGC JV
Papua New Guinea, Papua New Guinea
BAM Clough
Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.
The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

Woodside Energy Limited
Karratha, Western Australia, Australia
BAM Clough Joint Venture
BAM Clough Joint Venture was awarded the contract to construct a new LNG Jetty as part of the Pluto LNG Project for Woodside on the Burrup Peninsula near Dampier in Western Australia.
Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

Woodside Energy Limited
Dampier, Western Australia, Australia
Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)
The Harbourworks Clough Joint Venture (HCJV, now BAM Clough) completed a substantial contract to undertake construction of a 150 metre long jetty extension to Woodside Energy’s existing LNG export marine terminal, at Withnell Bay near Dampier, in Western Australia. The project provided an additional berth loading facility for LNG export tankers with a capacity up to 145,000 cubic metres, as part of Woodside Energy’s LNG Train V Expansion Project.
Woodside LNG Jetty – Train V Expansion
Woodside LNG Jetty ̵...Learn MoreWoodside LNG Jetty – Train V Expansion
Learn More
Woodside Energy Limited
Dampier, Western Australia, Australia
Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)
The Harbourworks Clough Joint Venture (HCJV, now BAM Clough) completed a substantial contract to undertake construction of a 150 metre long jetty extension to Woodside Energy’s existing LNG export marine terminal, at Withnell Bay near Dampier, in Western Australia. The project provided an additional berth loading facility for LNG export tankers with a capacity up to 145,000 cubic metres, as part of Woodside Energy’s LNG Train V Expansion Project.