Energy Australia
Yallah, New South Wales, Australia
Engineering, procurement and construction scope for Australia’s first net zero emissions hydrogen and gas capable power plant in New South Wales.
Snowy Hydro
New South Wales, Australia
Future Generation
The Clough Salini joint venture, Future Generation, was awarded the AU$5.1bn contract for the Civil and Electro-Mechanical works for the Snowy 2.0 Project.
Snowy 2.0 will link two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels to the depths of up to one kilometre and an underground power station with pumping capabilities. Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of energy storage for the National Electricity Market, enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar droughts. Snowy Hydro already plays a critical role in ensuring system stability at times of peak demand, and Snowy 2.0 will enhance this existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.
For up to date information about this project please visit www.futuregenerationjv.com.au or www.snowyhydro.com.au/our-scheme/snowy20/.
Clough engineers, constructs, commissions and maintains critical facilities for the Resources, Energy, and Infrastructure industries.
Energy Australia
Yallah, New South Wales, Australia
Engineering, procurement and construction scope for Australia’s first net zero emissions hydrogen and gas capable power plant in New South Wales.
Snowy Hydro
New South Wales, Australia
Future Generation
The Clough Salini joint venture, Future Generation, was awarded the AU$5.1bn contract for the Civil and Electro-Mechanical works for the Snowy 2.0 Project.
Snowy 2.0 will link two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels to the depths of up to one kilometre and an underground power station with pumping capabilities. Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of energy storage for the National Electricity Market, enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar droughts. Snowy Hydro already plays a critical role in ensuring system stability at times of peak demand, and Snowy 2.0 will enhance this existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.
For up to date information about this project please visit www.futuregenerationjv.com.au or www.snowyhydro.com.au/our-scheme/snowy20/.

Rio Tinto
Wickham, Pilbara, Western Australia, Australia
Clough were contracted by Rio Tinto to complete FEED, detailed design & procurement support for the Cape Lambert Power Station near Wickham in Western Australia’s Pilbara region. In parallel Clough conducted a concept analysis evaluating the most economic method for staging power output to match the forecast demand curve.
Scope includes: site establishment, earthworks including powerstation pad and roadworks, access road, abutments, sedimentation pond, evaporation pond and embankments, access road, Site drainage, installation of two GTG Packages steam cycle equipment, including one ACC, one STG Unit and all BOP, design and installation of a sewage treatment plant in accordance with specifications and datasheets
Cape Lambert Power Station EPCM
Cape Lambert Power Stati...Learn MoreCape Lambert Power Station EPCM
Learn More
Rio Tinto
Wickham, Pilbara, Western Australia, Australia
Clough were contracted by Rio Tinto to complete FEED, detailed design & procurement support for the Cape Lambert Power Station near Wickham in Western Australia’s Pilbara region. In parallel Clough conducted a concept analysis evaluating the most economic method for staging power output to match the forecast demand curve.
Scope includes: site establishment, earthworks including powerstation pad and roadworks, access road, abutments, sedimentation pond, evaporation pond and embankments, access road, Site drainage, installation of two GTG Packages steam cycle equipment, including one ACC, one STG Unit and all BOP, design and installation of a sewage treatment plant in accordance with specifications and datasheets